Roasthubs

Your hardware stays. Your system gets a complete upgrade.

Running an existing plant? We strip the old electrical cabinet and controls, install a modern PLC and Roasthubs, and get you back into production — without replacing your roasters.

Works with every major roaster OEM

  • Probat
  • Loring
  • Neuhaus Neotec
  • Brambati
  • IMS-Ritter
  • IMF
  • Buhler
  • Petroncini
  • TecAire

Your roasters are fine. Your control system isn’t.

Industrial roasting machines last decades. Their control systems don’t. Old PLCs, proprietary software, no data, no remote access, that’s the real problem. We solve the software and controls layer without touching what’s working.

No production stoppage

We plan the electrical strip and re-wire to minimise downtime. Most retrofits are completed during scheduled maintenance windows.

Your data, finally

Old systems give you nothing. After a retrofit, every roast, every batch, every parameter: logged, searchable, comparable.

Open protocols from day one

Because we master Profinet, Profibus, Modbus, OPC UA and hardware contacts, we can talk to anything. No vendor lock-in.

Three steps from old system to full control.

1

You send us your documents

Share your PID flow sheet and existing electrical schematics. That's all we need to design your new system and prepare a full quotation.

2

We deliver a detailed quote

We prepare a full scope, including hardware, engineering, and commissioning hours. Transparent pricing, no surprises.

3

We implement & integrate

Our team handles the electrical cabinet, PLC programming, Roasthubs integration, and full commissioning on-site at your roastery.

Ready for step 1?

Send us your PID and schematics and we’ll prepare your quote.

Request a retrofit quote →
A modern retrofitted electrical cabinet built by Roasthubs

Protocol expertise

We speak every language your plant speaks

This is why roaster brand doesn’t matter. We’ve seen every protocol combination in the field. We know how to make them talk.

  • PROFIBUS
  • Ethernet
  • Modbus
  • Hardware contacts
  • PROFINET
  • Siemens S7
  • MQTT
  • OPC UA

Free e-book

Industrial Plant Control for Coffee Roasteries

Want to understand the full technical picture before you retrofit? This guide covers OT/IT architecture, protocols and retrofit strategy, written for industrial coffee roasteries.

An operator working at a control terminal in a coffee roastery

Ready to modernise your plant?

Send us your PID and electrical schematics. We’ll come back with a complete picture.